Ongoing Project

Driftwood Residential Redesign

This page highlights the current scope, timeline, and stage-by-stage progress of a premium residential redesign project now under execution.

Progress Scrubber

Drag to review construction progress

Use the slider to move across the current project journey from early setup and structural work toward later execution stages.

Frame 1 Driftwood Residential Redesign progress frame 1
Site Mobilization

Initial site setup, marking, and early structural preparation are underway.

1 / 7
Early setup Structural work Coordination Build progression

Project Details

Status Ongoing
Address Driftwood St, Houston, TX 77021
Estimated Duration 4-5 weeks
Current Phase Structural and service coordination
Built-Up Area 1600 sq. ft.
Enquire About Similar Work

Scope of Work

  • Replacement and upgrade of AC units and electrical systems
  • Construction of new pantry, bedroom, and washroom spaces
  • Window replacement and directional modifications for improved natural lighting
  • Exterior repainting and aesthetic enhancements
  • Installation of new kitchen cabinets and countertops
  • Patio development, flooring upgrades, and smart Bluetooth-enabled garage door replacement

Milestone Timeline

  • Weeks 1-2: Rehabilitation, structural work, and construction of new bedroom, bathroom, patio, and pantry.
  • Weeks 3-4: Window replacements, electrical upgrades, AC installation, flooring, and kitchen remodeling.
  • Final Week: Exterior painting, garage door replacement, and interior finishing work.